by Марія | Sep 28, 2017 | News
The works on the construction of a shopping center in the Semitsvit residential complex in Lviv are actively moving. The shopping center project was created by our specialists. Work on the insulation of the facades, the installation of windows, facade systems,...
by Марія | Sep 14, 2017 | News
The administrative building of the Ivano-Frankivsk Archdiocese of the UGCC in Frankivsk is actively being built. The project of the building was created by our specialists. Concrete laying of the base plate, concrete laying of the walls of the basement floor and the...
by Марія | Sep 5, 2017 | News
According to our project, the construction of the production shop of the factory №2 in the Kozhichi village in the Lviv region. The production shop of the factory carved the building, concrete floor preparation, external engineering networks. Work on the installation...