According to our project, the construction of the production shop of the factory №2 in the Kozhichi village in the Lviv region.
The production shop of the factory carved the building, concrete floor preparation, external engineering networks. Work on the installation of the roof is finished, installation of walls from the sandwich panels. Suit travels, installation of internal engineering networks is carried out. Work to arrange a road around the enterprise territory and an additional arrival is also underway.