by Марія | Sep 28, 2017 | News
The works on the construction of a shopping center in the Semitsvit residential complex in Lviv are actively moving. The shopping center project was created by our specialists. Work on the insulation of the facades, the installation of windows, facade systems,...
by Марія | Sep 14, 2017 | News
The administrative building of the Ivano-Frankivsk Archdiocese of the UGCC in Frankivsk is actively being built. The project of the building was created by our specialists. Concrete laying of the base plate, concrete laying of the walls of the basement floor and the...
by Марія | Sep 5, 2017 | News
According to our project, the construction of the production shop of the factory №2 in the Kozhichi village in the Lviv region. The production shop of the factory carved the building, concrete floor preparation, external engineering networks. Work on the installation...
by Марія | Aug 30, 2017 | News
According to our project, construction of a four-section apartment house in Truskavets, Lviv region. The first section has 4 floors. The technical floor is completed and the roof is being constructed. On the second and third sections the foundations are laid, the...
by Марія | Aug 28, 2017 | News
The construction of «Pans’ka Vertykal’» multi-apartment house in Stryi, Lviv region, designed by our specialists, is in a full action. The first section is already built, some works are being carried on the facade decoration, they arrange roof coverings and install...