The process of building an apartment on the Velychkovskogo Street in Lviv designed by specialists of the Comfortbud Design Institute

In the first stage workers are working on reinforcing walls and floors of 10 floor. As well as interior wall partitions between apartments and rooms on the lower floors. On the second stage of work is underway to control indentation piles to determine (specification) required length piles. We present you the photo report of construction:

Автор Марія

"

Read more

In the first stage workers are working on reinforcing walls and floors of 10 floor. As well as interior wall partitions between apartments and rooms on the lower floors.
On the second stage of work is underway to control indentation piles to determine (specification) required length piles.

We present you the photo report of construction: