In design, this phrase means far more than a formal approval of documentation. It refers to a full cycle of reviews confirming that the facility can be built legally, safely, and in full technical compliance. Any project starts with initial data: Urban Planning Conditions and Restrictions, technical specifications for connection to utility networks, the design brief, and confirmation of rights to the land plot. This is the basis on which the design documentation is formed.
Once the design is complete, the documentation undergoes an expert review. This is a comprehensive assessment of compliance with state building regulations, including safety requirements, environmental standards, engineering provisions, and the cost estimate section. A positive expert conclusion means that all solutions have been verified and comply with legislation.Only after this can the client submit documents to the State Inspectorate of Architecture and Urban Planning of Ukraine and obtain a permit to carry out construction works.

A project that has passed expert review provides for:
- compliance with State Building Codes of Ukraine and legislation;
- safe structural and engineering solutions;
- a correct cost estimate and financial transparency;
- the possibility to officially start construction.
“A positive expert conclusion means that the construction project meets all legislative requirements in the field of construction and can be submitted to obtain a permit for works,” COMFORTBUD engineers note. For facilities with medium and significant consequences (СС2 and СС3), passing expert review is a mandatory condition for implementation. At COMFORTBUD, we support projects at every stage – from obtaining the initial data to securing a positive expert conclusion. This gives the client confidence that the project not only looks convincing on paper, but is also ready for legal and safe implementation.